Toogood Gold Project
Highlights
-
118 sq km property hosting >28 km of highly prospective trend
-
Geological belt hosts multiple recent significant gold discoveries (same structural terrain as Toogood)
-
50 km north of Queensway Project (New Found Gold) and 200 km northeast of Calibre’s Valentine Lake Gold Mine (~7.8 Moz Au reserves + resources1)
-
>25 historical and new prospects with numerous occurrences of coarse (1+ cm) and fine visible gold
-
Bonanza grades, up to >7800 g/t Au rock sample (7.8 kg/t Au)
-
Highly underexplored, never drill-tested before 2022
-
High-grade drilling discovery (2022) at “Quinlan”
-
Visible gold in 15 of 19 drill holes, OPEN in all directions
-
Both orogenic and epithermal Au, usually favorable metallurgy
-
Excellent access and infrastructure in tier-1 jurisdiction

Toogood Gold's land package is located in a 118 sq m geological belt that hosts several major discoveries including Marathon Gold's Valentine Lake Project, acquire by Calibre Gold for $350 M

Past drilling at the Quinlan prospect (2022): 19 HQ-sized drill holes totalling 857.5 m identified a 1.5-4.5 m wide altered felsic dyke hosted in shale.

Quinlan Gold Discovery
2022 Maiden Drill Program at Quinlan
Drill assay results include:
-
23.90 g/t Au / 3.65 m from 4.75 m (83 g*m) including 43.22 g/t Au / 1.95 m
-
18.27 g/t Au / 4.25 m from 41.25 m (78 g*m) including 70.31 g/t Au / 1.05 m
-
9.40 g/t Au / 3.18 m from 9.40 m (37 g*m) including 22.76 g/t Au / 1.10 m
-
19 HQ holes (857.5 m) intersected a 1.5-4.5 m wide altered auriferous felsic dyke
-
Visible gold in core identified in 15 of 19 drill holes
-
Drilling defined high-grade in-situ dyke 200 m in strike length and 120 m downdip
-
Mineralization remains OPEN in all directions
Exploration Plan
Commencing Q3 2025, near-term catalysts anticipated.
2025 Drill Program
-
2,000 m diamond drilling program planned for Q3 2025
-
Fully permitted, access roads in place
-
Significant step-outs along strike and down-dip at Quinlan
-
Investigate Quinlan MRE potential
-
Test for areas of potential dilation (bends/jogs/structural intersections)
-
Test additional high-priority target(s)
-
Anticipated start in June
-
First results expected Q3 2025

2,000m diamond drill program planned for Q3 2025 to advance the Quinlan target and test new drill targets
2025 Regional Exploration
-
Systematic sequential exploration methodology
-
Same approach led to Quinlan Discovery
-
Regional geochemical survey, aiming to cover full project by 2026
-
Prospecting and geological mapping
-
Rapid evaluation of targets to accelerate discovery timeline
